Concept
Manner, Frequency, and Intensity
Scope of easements, profits, and licenses
Manner, Frequency, and Intensity
A court that has fixed an easement's baseline has answered only half of a scope dispute, because the holder's use rarely stays as it was on the day the easement arose. A holder can try to enlarge an easement in two ways: by using it more intensively or by using it to benefit additional property.1 This unit takes up the first way, and the section on benefiting non-dominant land takes up the second.
Section 4.10 of the Restatement (Third) of Property: Servitudes supplies the default rule. Unless the servitude's terms limit it, the holder of an easement or profit may use the servient estate in a manner reasonably necessary for the convenient enjoyment of the servitude. The manner, frequency, and intensity of that use may change over time to take advantage of developments in technology and to accommodate normal development of the dominant estate or enterprise. And unless the terms authorize it, the holder may not cause unreasonable damage to the servient estate or interfere unreasonably with its enjoyment.2
The provision holds a base standard, two sources of permitted change, and a ceiling. It also works as a gap-filler. The terms it defers to are those determined under the standard for reading a servitude, which looks to the parties' intention as shown by the language they used and the circumstances surrounding creation.3 Where the instrument fixes the width, the route, or the permitted use, those terms control, and the default governs only the room they leave open.
The default exists because an easement can outlast its drafters by generations, while the land around it, the available technology, and the dominant owner's needs keep changing. A rule that froze the use on the date of creation would starve the grant of its purpose: a way laid out for wagons would be of little value to a household that must now reach its house by car. A rule that left the holder free to change the use without limit would fail in the opposite direction, because it would shift the cost of every change to a servient owner whose land was burdened for a defined purpose. The default therefore permits evolution that serves the original purpose and stops where the burden on the servient estate becomes unreasonable.
Five subsections follow. The first states the base standard of reasonable necessity for convenient enjoyment. The next two explain the sources of growth, technology and normal development of the dominant estate. The fourth marks the ceiling against unreasonable burden, and the fifth applies all of it to a dominant parcel divided among several owners.
Convenient Enjoyment Standard
The base rule says that, except as limited by the servitude's terms, the holder may use the servient estate in a manner reasonably necessary for the convenient enjoyment of the servitude.4 Two words in the standard restrain each other. Convenient tells a court that the holder need not prove the easement would be worthless without the activity in question. Necessary tells a court that convenience alone authorizes nothing, because the enjoyment of the grant must reasonably require the activity.
The standard rests on the idea that an easement carries the incidents needed to enjoy it: the acts and modest improvements that accompany the main right even though the instrument never lists them. The Mississippi court in Bivens described the owner of an easement as holding the right to exercise all the incidents necessary for its full enjoyment.5 A right of way limited to bare permission to cross would be hollow. A holder who could not gravel a washed-out track, clear a fallen limb, or bring across the vehicles the dominant land requires would hold a right on paper that the ground would not let the holder use. Parties who create a way presumably meant it to work, so a court reads the grant to include what makes it work.
Courts find those incidents in the circumstances of creation. In Rowell, the land was a cattle ranch when the easement arose, which made the right to erect gates indispensable, and the court looked to the parties' contemplation even though the easement there was involuntary.6 The inquiry asks what the parties agreed, not which uses a court thinks would hurt the servient owner, as in a zoning decision. If the agreement permits a use with a significant impact, or bars a use with no material effect, the agreement controls.7
The same standard confines the holder, because it measures the incidents against the purpose of the grant. The servient owner agreed to carry a defined burden, and if every convenience the holder later discovered counted as an incident, the burden would grow with the holder's ambitions and not with the grant. A logging-road easement, for example, cannot be used for residential purposes.8
Bivens shows the standard at work on a deed that said only “ingress and egress.” The court reasoned that such an easement covers surface use and whatever improvements and maintenance the roadway needs to permit continued travel, and that access to a homesite implies the right to bring in the vehicles, equipment, and materials needed to build or repair the home.9 A homesite reachable only by walkers could be neither built on nor kept in repair. The court then asked whether buried utility lines follow the same reasoning, a question about changes in technology that the next subsection takes up.
The other side of the line appears when a holder uses the strip for something other than getting across it. The owner of a right of ingress and egress through an alley across a neighbor's lot may drive vehicles through the alley but may not use it to park them.10 The vehicles and the alley are the same in both activities. What changes the answer is whether the activity is part of passage. Driving through is the use the easement serves. Parking occupies the strip as a place to leave things, a different use that passage never required.
Two errors recur on exams. The first reads reasonably necessary as absolute necessity, as if the holder had to show that no other way of enjoying the easement exists. The standard asks only whether the activity reasonably accompanies convenient enjoyment for the intended purpose, which is how Bivens reached construction traffic for a homesite. The second reads convenient as a license for anything the holder finds handy, which ignores both the purpose limit and the ceiling in the provision's last sentence. That sentence bars unreasonable damage to the servient estate and unreasonable interference with its enjoyment, and a later subsection treats it in full.11 And the default yields to the instrument: where the deed limits the use to pedestrians, no argument about convenience adds vehicles.
Technological Change
The second sentence of § 4.10 supplies the technology principle: the manner, frequency, and intensity of an easement holder's use may change over time to take advantage of developments in technology.13 The base standard asks what is reasonably necessary for convenient enjoyment, and this sentence adds that the answer is measured against the means available when the dispute arises, not only the means available when the grant was signed. Like the rest of § 4.10, the principle yields to the servitude's terms, so an instrument that limits the holder to a particular method controls over any appeal to progress.
The rule reflects how long easements last and how little their drafters can see. A right of way or utility line may outlive its drafters by generations, and those drafters could not know what the dominant land would need in a later era. If a court read the grant as frozen at the technology of its date, a stated purpose such as bringing power and communication into homes would go unserved as soon as the means of serving it changed, and the grantee's right would shrink with time. Reading the grant by its purpose avoids that result, because the purpose stays fixed while the means of serving it may change. The rule also has a limit that comes from the servient side. That owner accepted a burden defined by a purpose, so a new technology fits only if it serves the same purpose without imposing a materially different burden, and the ceiling against unreasonable damage and interference stays in force.14 The inquiry therefore has two parts: does the new means do the same job as the old, and does doing the job that way change the kind of burden the servient land carries?
Utility easements supply the clearest examples of the first part. In Henley v. Continental Cablevision, the easements dated from 1922 and had been obtained to bring electric power and telephone service to the homes of a subdivision. The court concluded that their evident purpose was to acquire and keep available the means of bringing power and communication into the homes, that technological progress had added an unforeseen dimension to the communication they were meant to carry, and that using the facilities already installed was the most economical and least environmentally damaging course.15 The New York court in Crowley v. New York Telephone Co. refused to treat the omission of cable television from a 1949 telephone-pole easement as a bar, reasoning that the parties' rights must be read in light of scientific advances.16 And the California court in Salvaty v. Falcon Cable Television called cable equipment on surplus pole space part of the “natural evolution of communications technology.” Installing it was consistent with the easement's goal of wire transmission of power and communication, and the court could not see how it materially increased the burden on the servient land.17
Most courts now follow these decisions, so that an easement for electric and telephone purposes may carry cable transmission, and later decisions reach similar results for wireless telephone equipment and fiber-optic cable.18 The progression from telephone wire to cable to fiber is one purpose served by successive means.
The principle covers new ways of doing the same job and stops short of a new job. An easement for a telephone line cannot carry a natural gas pipeline, which is a different use and not a new means of the same one, and in each case the inquiry is whether the new use is consistent with the original easement.19 The words of the grant can also draw the line. The Texas Supreme Court held in Marcus Cable Associates v. Krohn that an easement for “an electric transmission or distribution line or system” did not allow cable television lines. Courts have also split over cable on utility easements acquired by prescription, where the baseline is the use that created the right. A Michigan appellate decision, Heydon v. MediaOne, allowed it, while an Alabama appellate decision, Jackson v. City of Auburn, did not.20
General access easements raise the same question, and the courts divide more sharply. In Bivens, the deed said only “ingress and egress” to a homesite, and the Mississippi court held that the easement could carry a water line, sewer line, or fiber-optic cable, because the uses reasonably necessary to enjoy an easement change as technology changes. A surface roadway may once have been all that access to a structure required, but even simple structures are now connected to the outside world.21 The court relied on a Restatement illustration of a deed granting ingress and egress to the public street and silent about utilities. Unless the circumstances suggest otherwise, the purpose of such an easement generally includes access for the utility services normally used with property of that kind.22
Other courts disagree. Numerous decisions hold that an easement for ingress and egress does not include a right to install utility lines, and Ware v. Public Service Co. of New Hampshire confines the grantee to the particular purpose the deed specifies.23 The split turns on how the stated purpose is described. Bivens treats access to a homesite as the purpose and utility service as one of its modern means, while the contrary decisions treat ingress and egress as passage over the surface, so that a buried line is a different use for which a separate right must be bought. Behind the disagreement lies a policy choice between protecting the servient estate's rights in their narrowest form and giving the dominant owner uses that seem reasonable under contemporary conditions.24
The clearest ceiling on the principle appears in the railroad-trail cases, where a change in the nature of the use falls outside the original purpose. Landowners along closed rail lines have argued that a public trail goes beyond the easement they agreed to carry. In Preseault v. United States, the court agreed that converting railroad easements into public walking trails expanded their scope, even though by many measures a train is a more intensive use than hiking.25 The court reasoned that trains are limited in location, number, and frequency, while the burden of a public recreational trail is at the whim of many individuals and cannot be contained within the easement's parameters.26 The weight of recent authority likewise holds that a recreational trail is not within the scope of a railroad easement.27 Decisions elsewhere are mixed. A Maryland decision, Chevy Chase Land Co. v. United States, held that a railroad easement could be converted to a trail without unduly burdening the servient estate. A Washington decision, Lawson v. State, went the other way, reading the easement as limited to railroad purposes, so that conversion to a trail constituted abandonment.28 Because these are factual questions, courts and juries may disagree, and the overall inquiry is whether the use is consistent with the original easement.29
Henley and Preseault sit on opposite sides of the line for a reason that fits in a sentence. The cable in Henley used facilities already in place, carried the same kind of service to the same homes the easements were meant to reach, and added no material burden. The trail in Preseault changed the user from a carrier of goods and passengers to the public at leisure, and it changed the activity from transport to recreation. A useful test asks whether the change is evolutionary or revolutionary for the dominant estate; the cable is the first, and the trail is the second.30 The presumption that the parties contemplated a scope reasonably serving the grant's purpose lets an easement expand with the times, but it does not allow a change that was not reasonably foreseeable when the easement arose.31
Exam answers go wrong in three ways. One treats the technology clause as a license for any modern use the holder finds efficient, which ignores the requirement that the new means serve the original purpose without a different burden. Another treats silence about a later technology as a bar, which would freeze the easement at the date of grant against the Restatement's express allowance for change. The third compares traffic alone, but fewer vehicles or less noise does not make a use of a different kind fit the grant, as Preseault shows.
Normal Development of the Dominant Estate
When the land that an easement serves changes character, the question is whether the new uses of the servient land that the change requires fall within the grant. For an appurtenant easement created by conveyance, the First Restatement answers that the interpreter may assume the parties contemplated a normal development of the use of the dominant tenement.33 The Third Restatement reaches the same place from the holder's side: unless the servitude's terms limit it, the manner, frequency, and intensity of use may change over time to accommodate normal development of the dominant estate or enterprise.34 The previous subsections asked how the holder may use the way as originally described and how the means of use may follow technology. This one asks what happens when the benefited parcel itself changes, and the controlling word is normal.
Parties who create an easement know that the land it serves will not stay as it is. A farm may be subdivided, a household may grow, or a neighborhood may fill with homes, and a way frozen to the dominant land's use on the day of signing would lose value with every change. Courts therefore assume that the parties anticipated change and would have agreed to normal changes had they thought about it.35 The presumption has a boundary that protects the servient owner. A reasonable servient owner would probably agree to normal development of the dominant estate but would refuse a change that unreasonably burdened the servient land, even one that grows out of the dominant owner's ordinary progress.36 If the presumption reached every transformation, the servient owner would underwrite, without payment, a change the original price never covered.
The clearest application is a farm that turns into housing. Steve grants Dora a right of way when her land is a farm, the area then becomes residential, and Dora builds several houses and uses the way to reach all of them. The use is allowed, because the development of her land is reasonable, the way is reasonably necessary for access to the houses, and the new use does not unreasonably increase the burden on Steve's land.37 Those findings are the checkpoints a court uses. The change in the dominant land must be normal and reasonable, the new use of the way must be reasonably necessary to it, and the added burden must stay within what the servient owner could be expected to bear.
A smaller change fits the same frame. A deed lets Rachael take water from Leroy's Blackacre for her Whiteacre, a single-family home in a neighborhood of single-family homes, and the deed is silent about future change. The reasonable reading gives Rachael neither unlimited use nor use frozen at the house's original condition. The parties should have contemplated that her family might grow, that rooms might be added, and that more water would be needed. If the neighborhood sat at the edge of a district where duplexes were being built, it would not be unreasonable to expect Whiteacre to become a duplex.38
The same problem marks the limit. Suppose Rachael's single house were transformed overnight into a guest house. That is a change in the land's condition that human experience does not regard as common, so the parties should not be charged with foreseeing it, and the use is excessive and should be enjoined.39 Mining supplies a second failing case. Suppose a way was granted when Dora's land was a farm, valuable minerals are later found, and ore trucks begin hauling over the way. Mining may be a reasonable use of Dora's land, yet the trucks' noise and disruption may substantially increase the burden on the servient estate, and a court applying the reasonable-servient-owner reasoning should enjoin the new use. Many courts, however, ask only whether the dominant owner's use is reasonable and do not consider the burden on the servient estate.40 The approach that weighs both sides fits the Third Restatement, which pairs the allowance for normal development with a ceiling against unreasonable damage and interference.41
Commercial conversion raises the problem at larger scale. Suppose the successors to the holder of a residential access easement built a shopping mall, with hundreds of cars crossing the servient land each day. A court might conclude either that the easement was meant to serve residential and not commercial property, or that the noise, pollution, and traffic exceeded the intent the parties are presumed to have had, even if the neighborhood and the servient land were already commercial.42 The first ground concerns the character of the dominant use, and the second concerns its intensity. Set beside the farm-to-houses result, they show what separates the poles. Houses and added rooms continue what the way was granted to serve, which is people living on a parcel and getting to it. Ore hauling, a mall, and an overnight guest house change what the dominant land is for or multiply the traffic beyond anything the servient owner could have priced.
Courts compress this contrast into a workable formula: the permitted purposes may keep up with changes that might reasonably be anticipated for the dominant estate, which means evolutionary change and not revolutionary change.43 What could be anticipated depends on the surroundings, so the same growth can be normal in one place and excessive in another. In a problem involving an easement that served an asphalt business on a five-acre tract, the number of trucks crossing the way was a normal development of industrial use, though dust from the traffic might still unreasonably interfere with the servient owner's enjoyment.44
The First Restatement speaks only to appurtenant easements created by conveyance, because a conveyance is the one setting that has parties whose presumed contemplation a court can consult. An implied or prescriptive easement has no such grant, yet the growth idea carries over once the baseline is fixed: after the original scope and location are ascertained, the easement is subject to change and growth in the same way as a granted easement of the same original description.45 For those easements the difficulty lies in fixing the baseline, which the earlier sections addressed. The presumption also operates only where the instrument leaves a gap. Where the conveyance fixes the extent of the easement, its terms control, and § 4.10 opens with the same qualifier, so a deed that confines the way to agricultural use leaves nothing for the assumption of normal development to fill.46
Steps three and five do the real work. A reasonable venture on the dominant land does not carry a problem through both: mining on Dora's land may be a reasonable use of the parcel and still fail at the last step, while several new houses pass every step because each added trip is the kind of traffic a residential neighborhood normally generates.
Unreasonable Burden on the Servient Estate
The final sentence of § 4.10 sets the outer boundary for everything the earlier sentences permit: unless the servitude's terms authorize it, the holder may not cause unreasonable damage to the servient estate or interfere unreasonably with its enjoyment.48 The convenient-enjoyment standard and the allowances for technology and normal development say how much room the use has to grow. This sentence says how much of that growth the servient land can be made to carry. A holder whose use fits every earlier allowance therefore still faces a last question: what does the use do to the land and to the person who lives on it?
A separate ceiling is needed because the servient owner accepted a defined, limited burden. A use of the same general kind can shift costs onto that owner through noise, safety risk, or physical harm that the owner never anticipated and never agreed to carry. Courts therefore balance the holder's interest in developing the dominant land against the servient owner's interest in security from burdens the owner should not have had to anticipate.49 Without the ceiling, the permission to grow would work as a ratchet: each modernization the holder could justify by technology or development would pass to the servient owner as a cost, with no point at which the owner could say the burden was too much.
The sentence contains two prohibitions that protect different things. Unreasonable damage protects the physical condition of the servient land, which erosion, flooding, or a ruined surface can destroy. Unreasonable interference protects the owner's ability to use and enjoy the land even when nothing is physically harmed, as when traffic makes a yard unsafe or a night's sleep impossible. The word unreasonable does necessary work in both, because every easement burdens the servient land to some degree, and a holder who crosses a field cannot avoid wearing the ground. The rule tolerates the burden an owner would expect to carry when granting this kind of right and restrains the excess. The opening clause adds that the servitude's terms can authorize what would otherwise be excessive, which follows from the priority of express terms: an owner who agreed in the instrument to a heavy use cannot later call it unforeseeable.
The burden test sits on top of a separate question about kind. Increased use is permitted when the change is one of intensity and not of kind, and only so long as no unreasonable additional burden falls on the servient estate.50 Two gates follow. The first asks whether the use is still the kind the easement was granted to serve, which the earlier discussions of technology and normal development answer; a use of a different kind lies outside the easement and never reaches the balancing. The second gate applies to a use that passed the first. The holder may plainly be engaged in the activity the easement contemplated, and the degree or intensity of that activity may still amount to an unreasonable burden.51 The railroad-trail cases show the sequence: courts ask whether a trail is within the scope of a railroad easement at all and, if it is, whether its use unduly burdens the servient estate. In Chevy Chase Land Co. v. United States, the Maryland court held that the conversion was permitted and would not unduly burden the servient estate.52 A common mistake is to stop after the first gate and assume that a use of the permitted kind needs no further scrutiny.
Courts have found the second gate closed in several settings, and the cases sort roughly into damage and interference. In Peterson v. Town of Oxford, a drainage easement was used to serve a subdivision, with the result that water from a brook overflowed and eroded the servient estate, and the court held the burden unreasonable.53 That is the damage prong at work. In Davis v. Bruk, the court held that paving a country road would increase the speed of traffic and create a safety problem with cars passing near the servient owner's home, which makes it an interference case.54 Bassett v. Harrison likewise held that using a general right of way to haul sand and gravel was an unreasonable burden.55 In each case the dominant owner was doing something the easement could plausibly cover, and the servient owner prevailed because of what the use did on the ground.
The comparison with Hayes v. Aquia Marina, Inc. shows that the balance is driven by facts. There the dominant estate's marina grew from 84 to 230 boat slips and the road to the marina was paved, and the court held that this would not unreasonably burden the servient estate.56 Davis and Hayes both involved paving a road, so the paving cannot have decided either case. Each outcome turned on what the change would do to the particular servient land: in Davis the identified harm was speed and safety near a home, and in Hayes the court found no unreasonable burden even though the number of slips more than doubled. A large jump in numbers can therefore pass while a change as ordinary as paving can fail. The opposite mistake from stopping at the first gate is to treat a heavier use as unreasonable merely because it is heavier.
The ceiling still applies when the growth in use is a normal development of the dominant estate. In the asphalt-business problem from the last subsection, the number of trucks crossing the way was a normal development of industrial use and was not an unreasonable burden. The dust the trucks stirred up might still be an unreasonable interference with the servient owner's enjoyment, especially because repairing the road could control it, so the cure is a repaired road and not a lost easement.57 A court can also reach the same answer through either gate when the change is large. A shopping mall on the dominant parcel, with hundreds of cars a day crossing the servient land, could be found a use of a different kind, access for commerce instead of residences. A court could equally find that the noise, pollution, and traffic exceeded the intent the parties are presumed to have had, even in a commercial neighborhood.58 An answer on that fact pattern should argue both routes.
The ceiling also reaches an easement in gross, which benefits a person and no parcel, because the purpose of the grant fixes what use the holder may make. Marty holds a noncommercial easement in gross to fish and boat on a landowner's lake for his own pleasure. That personal easement likely does not support so intense a use as a commercial ski show, which would also draw participants and spectators onto the surrounding land. An easement to fish and boat carries the right to travel over the land as reasonably necessary to enjoy those activities, and it does not carry a right to use the grounds for large crowds.59 The same easement does cover reasonable ancillary use: unless the grant limits access to Marty alone, he may bring a reasonable number of guests for social or safety reasons.60 The line again falls between a use the purpose reasonably accommodates and one that multiplies the burden beyond it.
Even when a use exceeds the ceiling, a court can respond by limiting and regulating it. The court in Green v. Lupo allowed motorcycle use over a road while stating that the use could be limited and regulated to protect the legitimate interests of the servient owner.61 The remedies for excess use, and the reasons courts hesitate to end an easement over it, are taken up later in this chapter.
Step two filters out changes of kind before any balancing begins. Step four is where the same increase in traffic can come out differently on different records, as Davis and Hayes show.
Subdividing the Dominant Estate
Dividing the land that an easement serves is an ordinary change for a dominant estate, and the Restatement (Third) of Property: Servitudes makes room for it. Unless the servitude's terms limit it, the manner, frequency, and intensity of the holder's use may change over time to accommodate normal development of the dominant estate.63 For an appurtenant easement created by conveyance, the First Restatement reaches the same place by presuming that the parties contemplated a normal development of the use of the dominant tenement.64 Subdivision is the commonest form of that development, and the rule for it is settled. An easement appurtenant created by deed is apportionable when the dominant estate is divided, unless the instrument provides otherwise, so each part of the divided land takes the easement and its owner may use it as a dominant tenant.65 Most courts agree that the benefits of an appurtenant easement move to each portion of the dominant parcel upon its subdivision and transfer.66
The rule follows from what makes an easement appurtenant. Such an easement serves a parcel of land and attaches to every part of the dominant estate.67 When the owner conveys one quarter of a farm, the buyer takes the land and every appurtenance to it, whether or not the deed mentions appurtenances.68 No new right is created by the sale, and no personal privilege passes from one person to another. The existing easement goes with each piece of the land to which it was already attached. Every lot carved from the dominant estate is therefore still part of the dominant estate, and that fact separates subdivision from the situation in the next section, where a holder tries to use the way for land that was never part of the dominant parcel and the use falls outside the easement.69
Two separate reasons support apportionment. The first concerns what the parties expected: dividing and selling land is so common that people who create an appurtenant easement can be assumed to have contemplated it, which makes apportionment an expected feature of the bargain.70 The second concerns cost and benefit. Splitting the dominant estate usually adds only a slight burden to the servient estate when set beside the benefit the easement gives each new lot, so the likely gain exceeds the likely loss and apportionment is socially efficient.71 The second reason carries its own limit. It holds only while the added burden really is slight, and a subdivision large enough to upset that comparison loses the support the rule rests on. That is why apportionment never travels without a reasonableness check.
A four-way split of a farm shows the rule at work. A conveyed to B a right of way appurtenant to Whiteacre over a road across Blackacre. B then sold the four quarter sections of Whiteacre to four buyers, who kept using the road, and A objects and asks a court to enjoin them. The injunction should be denied, because each buyer took an easement appurtenant to the quarter bought, and apportioning the easement cast only a slight added burden on Blackacre compared with the benefit to the four quarters.72
Larger numbers do not change the starting point. In a standard illustration, E holds an appurtenant easement across O's property, and E's successors respond to urbanization of the neighborhood by dividing the original property into 100 homesites. Each new homeowner uses the easement to reach the public road, and every lot owner holds the easement, because subdividing the dominant estate does not in itself result in misuse. It is a reasonably foreseeable use of the easement, and on those facts it does not overburden the servient estate.73 The instinct to treat the sale of lots as the wrong, as though the easement belonged only to the original owner, therefore misreads an appurtenant easement. The land holds the right, and the land has simply been cut into pieces.
The limit lies in the burden. In Cox v. Glenbrook Co., the owners of a right of way proposed to subdivide their property into parcels of one acre or more, resulting in at least 40 and at most 60 parcels, with a residence and a guesthouse on each. The planned homes were permanent, not seasonal.74 The Nevada court required the trial court to determine whether the subdivision would impose an unreasonable additional burden on the servient estate.75 The 100-homesite illustration and Cox both involve dozens of residential lots, so the count alone cannot decide either one. What differs is the effect of the added traffic on the particular servient land, and in Cox that effect was the open question.
The hypothetical shows that the reasonableness check looks at the combined burden of all the lots, not at what any one lot adds. Each new owner uses the way as a dominant owner, but the servient owner feels everyone's traffic together, so the check from the preceding subsections runs against the whole subdivision. It also asks whether the change is one of intensity and not of kind.76 Lots that keep the use the way was granted to serve stay inside the easement, while lots devoted to a different kind of use raise the question of kind before any balancing begins. Finally, apportionment is a default. A deed that confines the way to the original tract as a single unit displaces it, because the servitude's terms control over the gap-filling rule.77